Survey Ops

Survey Operations

Bering Sea Survey Ops Links: , Web link

GOA/AI Survey Ops

Gulf of Alaska Ops Manual Links: Local file

Marel scale calibration

  1. Press “Zero” & “Menu” at same time.
  2. “CAL” will display in small window and “- - -“ will display in large window.
  3. Wait for prompt to place 20 kg weight on scale (make sure it’s not a 50 lb weight!)
  4. Wait for “Fit #” on display screen: Fit # < 25 = ok
    Fit # > 25 = Recalibrate
  5. If “E-92” displays = Error: Do Over.
  6. Remember to tare an empty basket!

Specimen scale 1. Press “CAL” while holding down “MENU” at same time. 2. “Wait with empty platform” will be displayed in large window and “CAL” in small window. 3. Wait for prompt “Place reference weight on platform” to place 2 kg weight on scale. 4. >Wait for “Calibration complete” and “Fit #” on display screen: Fit # < 25 = ok
Fit # > 25 = Recalibrate
5. If “E-92” displays = Error: Do Over. 6. Remember to tare an empty tray!

SFTP Instructions (DAILY!) Links: Local file

Stations & Maps Links: Local directory

Corrections

If you see mistakes or want to suggest changes, please create an issue on the source repository.